Carver: Cranberry Point Battery Storage Facility

  CLwpBS  battery bomb

Texas based PowerPlus is proposing a 150 MW lithium ion storage battery system in a residential neighborhood in Carver MA. Governor Baker calls this clean energy-it will store electricity from fossil fuel plants until maybe some day in the future there is renewable electricity in SE MA that needs storage. Carver already has 19 large ground mounted solar projects with battery storage. We've done our part. Put it elsewhere.

Whistleblower Reports

  CLwpBS  AD Makepeace

Throughout 2022, there were noise, truck limit, earth removal and other violations at various sand mining sites in Southeastern Massachusetts. Photos and records from whistleblowers show that earth removal companies […]

Carver: Cranberry Point: Siting Board Proceedings

  CLwpBS  battery bomb

In Massachusetts, siting board hearings concluded on 10/31/22 on PowerPlus Cranberry Point BESS storage system. The 150 MW project will be located in a residential neighborhood abutting cranberry bogs and over a sole source drinking water aquifer. Experts testified that CP's application was incomplete and did not have adequate protections for safety and prevention of air toxics in the event of a thermal runaway that will release toxic hydrofloruide gasses.