After the Conservation Commission denied a permit for sand and gravel removal on the site, Plympton Sand and Gravel is back with another proposal – a 22 acre solar array located within Critical Natural Landscape and a Zone II wellhead protection area.
-
The project will level the hill site while keeping the sand and gravel on site, and result in a total of over 22 acres of deforestation.
The Details are as Follows:
- Location: Route 44, Kingston
- Map and Lot: Map 92 Lot 5, Map 96 Lot 1, Map 96 Lot 2, Map 96 Lot 5, Map 96 Lot 6, Map 97 Lot 1, Map 97 Lot 2
- Site Owner: PK Realty Trust, dba Off Brook Street Realty Trust, Plympton Sand and Gravel, and Bishops Highway Solar, LLC
- Name of Project: Bishops Highway Solar
- Solar Developer: ReWild Renewables, LLC
- Engineer: Kimley-Horn, LLC
- Size of Project: 22 acres
- Megawatts: 5MW AC
- Battery Energy Storage System: Yes
Land Use and Natural Resources Impacts:
- A portion of the project is located within a Water Resource Overlay District
- The entire site lies within Critical Natural Landscape
- A portion of the project will result in deforestation with a Zone II wellhead projection area for the Town of Kingston
- The project is within 330 feet of Core Habitat
- The project is within 550 feet of Priority Habitat of Rare Species
- The project is adjacent to the Muddy Ponds Preserve
- The project will result in 22 acres of tree clearing (11 acres previously cleared without a building permit, 11 new acres of deforestation for this project)
See our analysis using MassMapper: Bishops Highway Solar
Required Permits:
- Site Plan Review from the Kingston Planning Board
- Site Alteration Permit from the Kingston Planning Board
- Stormwater Management Permit from the Kingston Planning Board
- Order of Conditions or Negative Determination from the Kingston Conservation Commission
Permissions/Consultations Already Completed:
- US Fish and Wildlife
- Natural Heritage and Endangered Species
- Mass Historical Commission
Upcoming Hearings/Public Comments:
- December 2, 2025: Written public comment deadline to the Kingston Planning Board
- December 8, 2025, 7 pm: Kingston Planning Board Site Plan Review, Site Alteration, and Stormwater Management Permit Public Hearing
Prior Hearings:
- N/A
Supporting Documents:
- 1_Project Narrative_Bishops Hwy_2025.10.23 2_Civil Plans – Bishops Highway Solar_2025.10.22 3_Stormwater Report – Bishops Highway Solar_2025.10.22 20250904 – Concept Layout with Existing Conditions
- 2_Civil Plans – Bishops Highway Solar_2025.10.22
- 3_Stormwater Report – Bishops Highway Solar_2025.10.22
- 20250904 – Concept Layout with Existing Conditions
Solar energy is essential to our state’s plans to reach net zero greenhouse gas emissions by 2050. However, clearing forests and open space for ground-mounted solar has become one of the leading causes of forest loss and land-use change in Massachusetss. Southeastern Massachusetts is home to the second largest area of coastal pine barrens in the US, home to 200 state-listed rare and threatened species. Habitat loss is the leading driver of loss of biodiversity, a key indicator of climate change. It is essential that we preserve our forests while growing solar. Read more: Growing Solar, Protecting Nature by Mass Audubon and Harvard Forest.