• Facebook
  • Instagram
  • Youtube
  • TikTok
  • Contact Us
Community Land & Water Coalition, Inc.
  • Home
  • About Us
    • Grassroots Organizing & Advocacy
    • Indigenous Rights and Culture
    • CLWC Leadership
    • Contact Us
  • Support Us
    • Ways to Support CLWC
    • Donate
  • Our Work
    • Stop Sand Mining
    • Protecting Wetlands, Waterways and Drinking Water
    • Forests & Biodiversity
    • Responsible Solar & Energy Siting
    • Take Action Right Now!
  • Resources
    • In the Press
    • Education
    • Blog
    • Podcasts
    • YouTube Channel
    • Newsletters
  • Events
    • Calendar
  • Search
  • Menu Menu

Tag Archive for: PineGate

Carver: PineGate’s “dual use” arsenic solar panel poles

January 11, 2022

Rochester Road: 44 acres, thousands of arsenic treated poles for 6,291 solar panels, lithium ion batteries in cranberry bog; earth removal nearby

Tremont Street: 57 acres, thousands of arsenic treated poles for 12,393 solar panels & lithium ion batteries in cranberry bog

Video October, 2021

340 Tremont St., Carver MA: Confirmed site of CCA-treated poles for solar, PineGate Renewables. The property may have been sold to PineGate Renewables.

September 6, 2022: Carver resident responds to the Carver Conservation Commission’s motion to dismiss her action as an abutter asking that the Conservation Commission enforce wetlands rules and address the harms caused by cancer-causing arsenic treated wooden poles on nearby cranberry bogs

Opposition-to-MTD-9.6Download

July 2022: Toxic poles contaminated with Copper Chromated Arsenate are being pulled from the Rochester Road site in Carver. Does this toxin remain in the ground or water after they are removed?

April 2022: Lawsuit update: Town files incomplete record omits records of site visits where Conservation Commission approved arsenic poles

On January 14, 2022, a homeowner abutting PineGate’s dual use solar project using arsenic treated timber poles sued the Carver Conservation Commission and PineGate Renewables. The lawsuit demands transparency and accountability from the Carver Conservation Commission. The public should not have to sue to get a straight answer and information about this crisis situation. PineGate admits arsenic is leaching into the soil. It will migrate to the groundwater. Instead of following the law, the Conservation Commission is fighting the lawsuit. It was required submit the entire record, all the documents, to the court for its review. Instead it omitted key documents.

Get the records and PineGate’s “studies” on the toxic poles here.

The January 14, 2022 lawsuit alleges the Carver Conservation Commission violated the Wetlands Protection Act TWICE:

1st in spring 2021 when it gave PineGate permission to replace the steel poles with arsenic timber poles, and

2d in fall 2021 it allowed PineGate to replace the arsenic poles with concrete.

These were two substantial changes to the project. They required a new permit application each time. They required a public hearing and a chance for public input. There should have been full and complete disclosure of PineGate’s studies of the impacts of the arsenic poles on soil, groundwater and cranberries. Instead, the Conservation Commission hid this information.

About 3,500 arsenic-treated wood poles have been driven into the Sole Source Aquifer and wetland cranberry bogs in Carver and Rochester to mount solar panels. PineGate has the poles at two locations: Rochester Road and Tremont Street. The lawsuit concerns only the Rochester Road site.

Dual use solar is called an “experiment” by Iain Ward, cranberry industry consultant and PineGate.  PineGate obtained Carver planning board and conservation commission approval for steel poles in 2019.  No state permits were required although the Department of Energy Resources issued a “statement of qualifications” for the project. oles.

In Fall, 2021, public outcry against the arsenic poles forced the Conservation Commission to act. Grassroots activists exposed the threats to public health, water and cranberry crops from PineGate’s copper-chromated arsenic poles PineGate.  With a wink and a nod and another closed door deal, the Carver Conservation Commission issued an order allowing PineGate to change the plans a second time – this time proposing to replace all 3,400 arsenic poles with concrete poles. The Conservation Commission violated the Wetlands Protection Act and Town Bylaw a second time.

The deal to replace the arsenic poles was a big win for the Pull the Poles grassroots campaign — but, the Town and PineGate refused to provide sampling result information or any details about how the replacement operation will occur, wetland impacts from the concrete poles and the results of PineGate’s water and soil sampling for arsenic. The law requires a full permit application for the concrete poles and a public hearing.

www.pullthepoles.org A grassroots campaign to protect our water from arsenic treated solar poles.=

The state’s SMART solar program gives additional subsidies for ground mounted solar on farm land. Some would say using arsenic poles for a “green” renewable energy project is not so “SMART”. Many say dual use “agrovoltaics” especially when combined with lithium ion batteries is a bad deal for our food systems and our farmland.

  • CCA toxic poles waiting to be installed at PineGate Renewables solar site at 340 Tremont Street, Carver MA, Sept. 2021

Events

July 31, 2019: Carver Conservation Commission issues Wetlands Order of Conditions.

Sept. 24, 2019: Carver Planning Board approval of site plan and special permt.

Dec. 22, 2020: Beals & Thomas construction plans submitted to the Planning Board show solar mounted on steel posts. Page 16 of the PDF.

On December 23, 2020 PineGate emailed the “Carver Permitting Department/Building Commissioner” to report on “minor updates” to the project. This included a “transition from I-Beams helical piles to timber piles.” The Public Records don’t show any response from the Planning Board, Building Commissioner or Conservation Commission in response to the email. On page 59 of the PDF. The Beals+Thomas construction plans do not say this.

Nov. 17, 2021: CCA – arsenic treated poles, Pine Gate Renewables dual use solar site, cranberry bog, 340 Tremont Street, Carver MA

February 23, 2021 Building Inspector issues Building Permit.

February 24, 2021, a letter to the Town says PineGate has taken over the project, calling it Solar Carver 1 LLC and Solar Carver 3 LLC. PDF page 51.

Spring 2021: Conservation Commission members Germain, Moore with Beals and Thomas and Monroe, Conservation Agent, tour the site, CCA poles are on site. They approve replacing steel poles with CCA timber poles

Summer, Fall 2021: Public outcry about CCA poles being installed along Route 58 and next to homes.

November 2021: Conservation Commission allows PineGate to replace CCA poles with concrete poles.

January 2022: Abutter to Rochester Road site sues Conservation Commission and PineGate for violations of the Wetlands Protection Act.

March/April 2022: Conservation Commission sends letter to DOER saying speed up the review process.

April 2022: Town of Carver Conservation Commission files “administrative record” that will form the basis for the evidence in the lawsuit. The record is incomplete. See a copy here.

https://communitylandandwater.org/wp-content/uploads/2026/03/FINAL-CLWC-LOGO-no-background-297x300.png 0 0 CLwpBS https://communitylandandwater.org/wp-content/uploads/2026/03/FINAL-CLWC-LOGO-no-background-297x300.png CLwpBS2022-01-11 21:31:002025-12-30 17:07:00Carver: PineGate’s “dual use” arsenic solar panel poles

“Dual-Use” solar on farmland and cranberry bogs is a bad idea

November 1, 2021

Science does not support the claim that cranberries or other crops can grow under solar panels.

Why are we investing hundreds of millions of dollars on the dual use experiment?

Dual use solar is being rolled out in Massachusetts in a reckless way. Thousands of wood pilings treated with arsenic (copper chromated arsenic) are installed in wetland cranberry bogs and the drinking water aquifer for “dual use” projects approved by the Secretary of Energy & Environmental Affairs. Read about the PineGate Renewables and AD Makepeace arsenic pole crisis in Carver MA. Arsenic poles are also in place on Rochester MA at Bay State Agricultural’s bogs.

Even the leading cranberry industry spokesman from Carver MA admits this as of May, 2021: “There is a lot of thought going into how to do these things right,” said Iain Ward, a veteran cranberry farmer and solar consultant who will be operating the parcels in Carver for Pine Gate. “In five to six years, we’re going to have new best practices specifically tailored to growing crops under dual-use arrays.” Unproven results – but hundreds of millions of dollars of projects are being built in the state.

Massachusetts and other states are promoting industrial solar facilities on farm land claiming that using the land for “dual” purposes – making electricity and growing food — are compatible land uses. There is no proof of this – the cranberry industry and Blue Wave solar, one of the big corporations promoting this idea — all admit this is “experimental.”

Massachusetts “dual use” regulations are part of the so-called SMART solar program. DOER pre-approves dual use projects and then they are supposed to meet the agricultural conditions after they are built. Some DOER “ letters for dual use projects are here if you want to look for a project in your community.

It appears all solar over cranberry bogs were approved by DOER based on an inadequate and flawed 3 month study in Carver MA using plywood panels.  UMass was involved in this so called study.

This flawed, backwards approach – approve the project, build it and see if crops will grow — has backfired in a big way in Carver MA. DOER approved three dual use projects valued at $55 million for cranberry bogs. The projects were approved using wood poles treated with copper chromated arsenic (CCA). When the public exposed this, DOER looked the other way and PineGate Renewables, facing liability and penalties, announced in November 2021 that it is removing and replacing the poles.

Taxpayer funds are being used to help private corporations justify these programs. DOER and the Massachusetts Department of Agriculture work together to funned money to UMass programs to provide research for the private solar companies like PineGate Renewables and REDP-the companies with toxic poles in Carver, MA.

The UMass Clean Energy Extension “was established with funds from the Department of Energy Resources” and works in partnership with DOER “to help it fulfill its mission and programmatic activities to promote clean energy.” https://ag.umass.edu/clean-energy/about/state-partner (accessed 11/8/2021)  With taxpayer funding, UMass undertakes a wide range of activities to support privately owned solar companies, including studying how solar PV panels affect crop production under the panels. 

The UMass Cranberry Station is using DOER funds conducting pilot projects and experiments to assist privately owned solar companies like PineGate Renewables, owner of the $53 million project in Carver putting toxic poles in cranberry bogs. The Cranberry Station is seeking a $1 million taxpayer grant to help the solar and cranberry industries justify “dual use” solar on cranberry bogs.

None of the cranberry bog projects that DOER has approved can show compliance with DOER’s SMART program without long term studies showing the agricultural use will not be negatively impacted under the panels.  The DOE grant will take several years to show results.  All solar over cranberry projects should be halted in MA

The batteries make the situation even worse.

Here’s what a Massachusetts resident whose family has been farming in Southeastern Massachusetts for 70 years expresses concern about dual use in October 2021 comments to the Massachusetts legislature. Writing about dual use on cranberry bogs, the resident writes:

cogliani-comments-to-tue-oct-12-2021-on-dual-useDownload

Here’s what farmer Fred Beddall from Northampton, Mass. has to say about DOER’s dual use solar program:

05.28.2021-guest-columnist-fred-beddall_-farmers-want-answers-from-mdarDownload

On October 27, 2921, the Northampton (MA) Agricultural Commission issued a statement on “Dual Use Solar Development on Prime Agricultural Lands.” The Commission supports renewable energy but doesn’t think we need to “sacrifice our best agricultural land to meet our energy goals.” The Commission opposes the industry’s Senate Bill 590 seeking more subsidies for ground-mounted solar projects on farmland. Read the statement here.

Northhampton Agricultural Commission Statement on “Dual Use” Solar Development on Prime Agricultural LandsDownload

https://www.njspotlight.com/2021/07/large-scale-solar-projects-threaten-nj-shrinking-farming-some-crops-might-flourish-but-major-limits/

https://communitylandandwater.org/wp-content/uploads/2026/03/FINAL-CLWC-LOGO-no-background-297x300.png 0 0 CLwpBS https://communitylandandwater.org/wp-content/uploads/2026/03/FINAL-CLWC-LOGO-no-background-297x300.png CLwpBS2021-11-01 07:32:002023-03-14 20:23:38“Dual-Use” solar on farmland and cranberry bogs is a bad idea

Archives by Month

Tags

AD Makepeace Aquifer Atlantic Coastal Pine Barrens Battery battery bomb Biodiversity Carver Carver MA corruption Craig Weston Cranberry cranberry bog Cranberry Country Corruption Cranberry County Corruption Deforestation DOER drinking water Earth removal Endangered Species Extinction Federal Road Forests Groundwater Indigenous Sovereignty Jim Kane Makepeace Massachusetts mining Pine Barrens Plymouth Reckless Development Resources sand and gravel Sand mining Solar Solar gone wrong Sole Source Aquifer strip mine Strip Mining Wareham Water water quality Wetlands Zoning Board of Appeals Zoning Violations

Community Land and Water Coalition

P.O. Box 1699, Plymouth, MA 02362
Email
Phone: 508-259-9154

Please consider making a donation to help strengthen our impact!

DONATE

You can sign our Sand Mining Petition to Governor Healy and town Selectboards here

Facebook
Facebook
fb-share-icon
YouTube
Instagram
Tiktok
JOIN OUR MAILING LIST

Join Our Email List

    Copyright © Community Land & Water Coalition   |   Privacy Policy   |   Site By LW Creative
    • Facebook
    • Instagram
    • Youtube
    • TikTok
    Scroll to top